# S12 — Asynchronous feedback for scheduling
|
||||
|
||||
Status: IMPLEMENTED
|
||||
|
||||
Agreed after the grill-me interview; shared understanding confirmed.
|
||||
|
||||
## User story
|
||||
|
||||
As a dance-school maintainer, I want feedback after starting Schedule Groups,
|
||||
so that I can see whether the backend is still calculating, when it finishes
|
||||
and what the outcome is, including when I leave and return to the show page.
|
||||
|
||||
## Background execution and concurrency
|
||||
|
||||
- Start scheduling in the backend without keeping the initiating HTTP request
|
||||
open until the calculation finishes. Navigation, page reloads and disconnected
|
||||
clients must not stop the calculation.
|
||||
- The backend owns the current scheduling status for each show. All open
|
||||
screens see the same status, including screens that did not start the run.
|
||||
- Allow at most one active calculation per show. Disable Schedule Groups while
|
||||
it is running and reject duplicate starts in the backend as well.
|
||||
- Different shows may calculate concurrently. A global capacity limit and a
|
||||
waiting queue are outside S12.
|
||||
- Retain the existing 30-minute solver limit and scheduling rules.
|
||||
|
||||
## Progress and outcomes
|
||||
|
||||
- While running, show elapsed time, the current optimization phase (attendance,
|
||||
spread or variety), and whether a valid solution has been found.
|
||||
- Report a valid solution as soon as the solver discovers one, including during
|
||||
a phase. Extend solver progress reporting rather than waiting for the phase
|
||||
to finish. Do not apply intermediate solutions.
|
||||
- Do not present a completion percentage or estimated finish time: the phases
|
||||
do not represent proportional parts of the calculation time.
|
||||
- Keep the latest status and outcome per show until a new calculation starts.
|
||||
Show the finish time and distinguish an optimal solution from a valid solution
|
||||
whose optimality was not proven within the time limit.
|
||||
- For a successful result, show a concise summary with concrete results for
|
||||
attendance, spread and variety, using understandable labels.
|
||||
- Clearly distinguish invalid input, infeasibility, solver failure, time limit
|
||||
without a valid solution and rejection because inputs changed. Explain why
|
||||
no result was applied and that existing assignments were preserved.
|
||||
Backend-restart interruption recovery belongs to S16.
|
||||
|
||||
## Applying results
|
||||
|
||||
- Retain the confirmation before starting that explains replacement of existing
|
||||
assignments. A successful completed calculation automatically replaces them;
|
||||
no preview/apply step is introduced.
|
||||
- A valid solution may be applied when the time limit expires even if optimality
|
||||
has not been proven.
|
||||
- Preserve the existing scheduling input revision check. A result based on
|
||||
outdated inputs must not replace the current assignments.
|
||||
- Failed, infeasible, interrupted, stale and no-solution calculations preserve
|
||||
existing assignments.
|
||||
- Report success only after the resulting assignments have been saved. Keep
|
||||
status and saved results consistent.
|
||||
|
||||
## Server-sent events and connection recovery
|
||||
|
||||
- Use server-sent events (SSE) for backend-to-frontend status updates.
|
||||
- On initial connection and reconnection, provide the current backend status.
|
||||
Correctness must not depend on receiving every previous event.
|
||||
- Maintain updates across navigation within the application so completion
|
||||
notifications can appear outside the show page.
|
||||
- If the connection is lost, indicate that displayed status may be outdated
|
||||
while the backend calculation continues. Reconnect and reconcile with the
|
||||
current status when connectivity returns.
|
||||
- Configure the application's proxy for streaming so updates reach the client
|
||||
promptly rather than being buffered until completion.
|
||||
|
||||
## Completion notifications
|
||||
|
||||
- Show an application-wide snackbar when a calculation completes or fails,
|
||||
including when the user has navigated to another application page.
|
||||
- Include the show name, a short outcome and a View show action.
|
||||
- Phase changes update progress without generating snackbars.
|
||||
- After temporary connection loss, show a missed completion notification once
|
||||
when the connection recovers. Reconnection must not repeatedly notify for
|
||||
the same completion.
|
||||
- Do not replay old snackbars on page reload or reopening the application;
|
||||
show the retained status on the show page instead.
|
||||
- Email, browser notifications and notifications outside the application are
|
||||
outside S12.
|
||||
|
||||
## Persistence and backend restarts
|
||||
|
||||
The maintainer explicitly transferred durable scheduling status and recovery
|
||||
following backend restarts to [S16](../in_review/S16_store-state-in-persistent-storage)
|
||||
when completing S12. The latest status and outcome in S12 survive navigation,
|
||||
page reloads and SSE reconnection while the same backend process remains active.
|
||||
Schools, assignments and scheduling status currently remain in memory.
|
||||
|
||||
S16 owns PostgreSQL storage of the latest run, atomic persistence of saved
|
||||
assignments and completed status, and startup recovery of previously running
|
||||
calculations as Interrupted without automatic resumption. Previously saved
|
||||
results must survive restart under S16. These are not completion criteria for S12.
|
||||
Distributed execution and scheduling on another PC remain in S13.
|
||||
|
||||
## Out of scope
|
||||
|
||||
- Cancelling a calculation or applying an intermediate solution.
|
||||
- History of earlier calculations beyond the latest status and outcome.
|
||||
- Global capacity limits, queues and remote workers.
|
||||
- Changes to scheduling objectives or constraints.
|
||||
- This specification grants no coding-standards waiver.
|
||||
|
||||
## Acceptance criteria
|
||||
|
||||
- [x] Starting Schedule Groups returns without waiting for solver completion;
|
||||
leaving or reloading the page does not interrupt the calculation.
|
||||
- [x] Opening a show in another screen recovers its current backend status;
|
||||
duplicate runs for the same show are prevented in frontend and backend,
|
||||
while different shows can run concurrently.
|
||||
- [x] Running status shows elapsed time, phase and discovery of a valid solution
|
||||
during a phase, without a fabricated completion percentage or ETA.
|
||||
- [x] SSE delivers status changes promptly through the deployed proxy. Initial
|
||||
connection and reconnection reconcile the current state, and loss of
|
||||
connectivity visibly marks status as potentially outdated.
|
||||
- [x] Successful runs automatically apply their result after the existing start
|
||||
confirmation, retain stale-input protection and distinguish proven optimal
|
||||
results from valid results at the time limit.
|
||||
- [x] The final display includes finish time and concrete attendance, spread and
|
||||
variety results when successful; unsuccessful outcomes are distinguishable
|
||||
and explain that previous assignments were preserved.
|
||||
- [x] An application-wide snackbar reports completion or failure with the show
|
||||
name and View show action, including after navigation to another page.
|
||||
- [x] Connection recovery notifies once for a missed completion; phase changes,
|
||||
repeated reconnection and reopening do not replay old snackbars.
|
||||
- [x] The latest status and outcome survive navigation, page reload and SSE
|
||||
reconnection within the lifetime of the running backend. Durable storage
|
||||
and recovery after backend restart are explicitly transferred to S16.
|
||||
|
||||
## Review handoff
|
||||
|
||||
Background execution, solver progress callbacks, SSE, frontend status recovery,
|
||||
result summaries, proxy streaming configuration and application-wide completion
|
||||
notifications are implemented and verified. S12 replaces S9's synchronous request
|
||||
behavior while retaining scheduling and result-application protections.
|
||||
|
||||
See [S12 validation](../S12-validation.md) for verification and retained standards
|
||||
signals. Durable storage and backend-restart recovery are tracked in S16 and do
|
||||
not block review of this specification under the agreed scope adjustment.
|
||||
Implementation is ready for review; final acceptance is pending.
|
||||