S19: record successful implementation and Gitea validation
This commit is contained in:
35
specs/S19-validation.md
Normal file
35
specs/S19-validation.md
Normal file
@@ -0,0 +1,35 @@
|
||||
# S19 implementation validation
|
||||
|
||||
Affected repositories: `agiledancers`, `landscape`, `engineering`.
|
||||
|
||||
All S19 acceptance checks completed on 2026-11-08:
|
||||
|
||||
- The two new repositories are published and checked out under ~/Projecten/git/.
|
||||
- The source inventory records ownership, source attribution and preserved licenses.
|
||||
- Engineering v1.0.0 supplies generalized mechanisms, templates, a project generator,
|
||||
version pinning, bootstrap and upgrade instructions.
|
||||
- Seven bootstrap/generator tests cover all component selections, actual Maven
|
||||
regeneration with generated/ absent, drift, moved tags and project-file preservation.
|
||||
- The formatter integration checks, 19 CI tests and 34 release tests passed.
|
||||
- A generated example built/tested through the common pipeline; actual isolated
|
||||
deployments of two digest-pinned revisions and rollback passed.
|
||||
- Agile Dancers passed its full pipeline from the Gitea checkout: 73 backend tests,
|
||||
19 standards regression tests, 32 frontend tests, 4 browser tests, both images,
|
||||
and combined backend coverage 1771/1841 (96.20%). The workflow checked the
|
||||
generated snapshot against the published engineering tag and commit first.
|
||||
- Both standalone Docker source builds passed locally using a disposable test
|
||||
database and BuildKit secrets for the backend.
|
||||
- Current project/landscape Markdown links were checked; no unresolved links remain
|
||||
in the checked documentation. Historical evidence remains application-owned.
|
||||
|
||||
Application commit: `c6a495a93c31bef86080915d7c939f642861a97a`.
|
||||
|
||||
Successful [Gitea build](http://192.168.2.28:3000/wanjakrah/agiledancers/actions/runs/64).
|
||||
|
||||
[Application evidence](http://192.168.2.28:3000/wanjakrah/agiledancers/src/commit/c6a495a93c31bef86080915d7c939f642861a97a/docs/S19-validation.md).
|
||||
|
||||
No production deployment was performed. Live NAS SSH authentication, production
|
||||
credentials and rollback of pre-S19 retained releases remain explicit operational
|
||||
validation limits. The release-state schema, existing Compose project and database
|
||||
volume remain compatible; review legacy health-hook compatibility before production
|
||||
rollback. Business-system extraction is outside S19.
|
||||
9
specs/S19.md
Normal file
9
specs/S19.md
Normal file
@@ -0,0 +1,9 @@
|
||||
# S19 — Multi-project engineering setup
|
||||
|
||||
Affected repositories: `agiledancers`, `landscape`, `engineering`.
|
||||
|
||||
This stable reference follows the specification through its lifecycle.
|
||||
|
||||
- [Specification](in_review/S19_multi-project)
|
||||
- [Resource classification](../S19-classification.md)
|
||||
- [Application validation](http://192.168.2.28:3000/wanjakrah/agiledancers/src/commit/c6a495a93c31bef86080915d7c939f642861a97a/docs/S19-validation.md)
|
||||
@@ -9,8 +9,8 @@ so that the complete show is manageable for dancers and enjoyable for audiences.
|
||||
|
||||
Refinement confirmed by the maintainer on 2026-11-03. This specification records
|
||||
the agreed design. Implementation and validation are complete and ready for review.
|
||||
See [validation evidence](../../docs/s18-validation.md) and
|
||||
[the applied scheduling rules](../../show-scheduling-rules.md).
|
||||
See [validation evidence](http://192.168.2.28:3000/wanjakrah/agiledancers/src/commit/c6a495a93c31bef86080915d7c939f642861a97a/docs/s18-validation.md) and
|
||||
[the applied scheduling rules](http://192.168.2.28:3000/wanjakrah/agiledancers/src/commit/c6a495a93c31bef86080915d7c939f642861a97a/show-scheduling-rules.md).
|
||||
|
||||
## Show scope and configuration
|
||||
|
||||
|
||||
@@ -2,7 +2,7 @@ As developer
|
||||
I want to separate landscape documentation and reusable engineering resources from Agile Dancers
|
||||
so that I adhere to ADR1 and can start and maintain multiple projects with a complete, versioned engineering setup.
|
||||
|
||||
Status: IN_PROGRESS
|
||||
Status: IN_REVIEW
|
||||
|
||||
Architecture: ADR1, Application size (`adr/approved/ADR1_application-size.md` before migration).
|
||||
|
||||
@@ -165,3 +165,13 @@ Complete the following before considering S19 implemented:
|
||||
|
||||
Production deployment is a separate action. Business capability extraction,
|
||||
runtime system boundaries, and migration of application data are outside S19.
|
||||
|
||||
## Implementation evidence
|
||||
|
||||
Implemented on 2026-11-08. See [validation](../S19-validation.md).
|
||||
|
||||
Application commit: `c6a495a93c31bef86080915d7c939f642861a97a`. Engineering release: `v1.0.0` at
|
||||
`c25ce11a1bb8bf97f24d5e2b12d98680a9c573ca`.
|
||||
|
||||
[Gitea build](http://192.168.2.28:3000/wanjakrah/agiledancers/actions/runs/64) completed successfully.
|
||||
Production deployment remains a separate action.
|
||||