# S19 implementation validation Affected repositories: `agiledancers`, `landscape`, `engineering`. All S19 acceptance checks completed on 2026-11-08: - The two new repositories are published and checked out under ~/Projecten/git/. - The source inventory records ownership, source attribution and preserved licenses. - Engineering v1.0.0 supplies generalized mechanisms, templates, a project generator, version pinning, bootstrap and upgrade instructions. - Seven bootstrap/generator tests cover all component selections, actual Maven regeneration with generated/ absent, drift, moved tags and project-file preservation. - The formatter integration checks, 19 CI tests and 34 release tests passed. - A generated example built/tested through the common pipeline; actual isolated deployments of two digest-pinned revisions and rollback passed. - Agile Dancers passed its full pipeline from the Gitea checkout: 73 backend tests, 19 standards regression tests, 32 frontend tests, 4 browser tests, both images, and combined backend coverage 1771/1841 (96.20%). The workflow checked the generated snapshot against the published engineering tag and commit first. - Both standalone Docker source builds passed locally using a disposable test database and BuildKit secrets for the backend. - Current project/landscape Markdown links were checked; no unresolved links remain in the checked documentation. Historical evidence remains application-owned. Application commit: `c6a495a93c31bef86080915d7c939f642861a97a`. Successful [Gitea build](http://192.168.2.28:3000/wanjakrah/agiledancers/actions/runs/64). [Application evidence](http://192.168.2.28:3000/wanjakrah/agiledancers/src/commit/c6a495a93c31bef86080915d7c939f642861a97a/docs/S19-validation.md). No production deployment was performed. Live NAS SSH authentication, production credentials and rollback of pre-S19 retained releases remain explicit operational validation limits. The release-state schema, existing Compose project and database volume remain compatible; review legacy health-hook compatibility before production rollback. Business-system extraction is outside S19.