Files
agiledancers/docs/S19-followup-validation.md

13 lines
758 B
Markdown

# S19 review follow-up — 2026-11-10
Engineering v2.0.0 at `46df72f008113d0ed683a6c7344b1d7309564d84` is pinned and committed.
Regeneration and bootstrap --check passed against the published tag and full commit.
Shared engineering tests passed: 8 bootstrap/generator, 21 CI and 34 release tests;
formatter integration passed. Java launcher documentation, varargs and console API updated.
Workflows use the shared user-scoped mini-pc runner for wanjakrah. It serves current
and future repositories without per-project registration. Skills are maintained in
landscape/skills/ and project agent instructions reference those workflows.
Project deployment credentials and runtime configuration remain application-owned.
No production deployment was performed.