# S19 validation
The [landscape specification](http://192.168.2.28:3000/wanjakrah/landscape/src/branch/main/specs/S19.md)
and [resource inventory](http://192.168.2.28:3000/wanjakrah/landscape/src/branch/main/S19-classification.md)
describe the repository split. Engineering owns the shared source; this project
consumes its selected tag and commit through engineering.lock.json.
Validated on 2026-11-08:
- Full Maven verification: 73 backend tests and 19 standards regression tests.
Existing approved waiver retained; no new waiver or threshold change.
- Full shared pipeline: frontend lint/build, 32 frontend tests, 4 Playwright
tests, both prebuilt Docker images and combined backend coverage
1771/1841 (96.20%).
- Standalone backend and frontend Docker source builds passed. The backend used
a disposable PostgreSQL container and BuildKit secrets for test configuration.
- Shared CI/release regression suites: 19 and 34 tests respectively.
- Engineering bootstrap/generator suite: 7 tests, covering all component choices,
actual Maven regeneration with generated/ absent, drift including new files,
obsolete-file removal, moved tags and preservation of project-owned files.
- Formatter integration checks passed. Upstream skills and attribution files
match their source snapshot byte for byte; only the skills index was adapted.
- A separate generated example passed its common pipeline and a real isolated
deployment of two synthetic revisions followed by rollback. Production was
not used. See engineering's VALIDATION.md and tests/acceptance.py.
Gitea build-run evidence for the migrated application commit is recorded with
S19 in landscape. Its workflow checks the pinned release before invoking the
same shared pipeline. Checkout and committed generated resources require no
sibling repository checkout.
Production deployment is a separate action. Live NAS SSH authentication,
production credentials and rollback against pre-S19 retained releases were not
exercised. The existing Compose project, database volume and release-state schema
remain compatible. Legacy releases without retained health.sh use the current
application health function; review that compatibility before production rollback.