Files
landscape/specs/S19-validation.md

50 lines
2.9 KiB
Markdown

# S19 implementation validation
Affected repositories: `agiledancers`, `landscape`, `engineering`.
All S19 acceptance checks completed on 2026-11-08:
- The two new repositories are published and checked out under ~/Projecten/git/.
- The source inventory records ownership, source attribution and preserved licenses.
- Engineering v1.0.0 supplies generalized mechanisms, templates, a project generator,
version pinning, bootstrap and upgrade instructions.
- Seven bootstrap/generator tests cover all component selections, actual Maven
regeneration with generated/ absent, drift, moved tags and project-file preservation.
- The formatter integration checks, 19 CI tests and 34 release tests passed.
- A generated example built/tested through the common pipeline; actual isolated
deployments of two digest-pinned revisions and rollback passed.
- Agile Dancers passed its full pipeline from the Gitea checkout: 73 backend tests,
19 standards regression tests, 32 frontend tests, 4 browser tests, both images,
and combined backend coverage 1771/1841 (96.20%). The workflow checked the
generated snapshot against the published engineering tag and commit first.
- Both standalone Docker source builds passed locally using a disposable test
database and BuildKit secrets for the backend.
- Current project/landscape Markdown links were checked; no unresolved links remain
in the checked documentation. Historical evidence remains application-owned.
Application commit: `c6a495a93c31bef86080915d7c939f642861a97a`.
Successful [Gitea build](http://192.168.2.28:3000/wanjakrah/agiledancers/actions/runs/64).
[Application evidence](http://192.168.2.28:3000/wanjakrah/agiledancers/src/commit/c6a495a93c31bef86080915d7c939f642861a97a/docs/S19-validation.md).
No production deployment was performed. Live NAS SSH authentication, production
credentials and rollback of pre-S19 retained releases remain explicit operational
validation limits. The release-state schema, existing Compose project and database
volume remain compatible; review legacy health-hook compatibility before production
rollback. Business-system extraction is outside S19.
## Review follow-up — 2026-11-10
Engineering v2.0.0 (`46df72f008113d0ed683a6c7344b1d7309564d84`) moves shared
agent workflows to landscape/skills/ and supplies a shared user-scoped mini-pc
runner setup. Upstream skill contents, attribution and licenses were preserved.
A newly generated project completed its build on the default mini-pc runner
without a project-specific registration, after the documented platform setup.
Consumer changes and validation remain application-owned:
[Agile Dancers PR](http://192.168.2.28:3000/wanjakrah/agiledancers/pulls/21) and
[Waterpolo Coaching PR](http://192.168.2.28:3000/wanjakrah/waterpolo-coaching/pulls/1).
The review's independent-image-name limitation remains recorded in the specification.
No production deployment is included in this follow-up.